I'm writing the back-end for a web app in Spring and it uses a MySQL database on an AWS RDS instance to keep track of user data. Right now the SQL tables are separated by user groups (just a value in a column), so different groups have different access to data. Whenever a person using the app does a certain operation, we want to back up their part of the database, which can be viewed later, or replace their data in the current branch if they want.
The only way I can figure out how to do this is to create separate copies of every table for each backup and keep another table to keep track of what all the names of the tables are. This feels very inelegant and labor intensive.
So far all operations I do on the database are SQL queries from the server, and I would like to stay consistent with that.
Is there a nice way to do what I need?

Why would you want a separate table for each backup? You could have a single table that mirrored the main table but had a few additional fields to record some metadata about the change, for example the person making it, a timestamp, and the type of change either update or delete. Whenever a change is made, simply copy the old value over to this table and you will then have a complete history of the state of the record over time. You can still enforce the group-based access by keeping that column.
As for doing all this with queries, you will need some for viewing or restoring these archived changes, but the simplest way for maintaining the archived records is surely to create TRIGGERS on the main tables. If you add BEFORE UPDATE and BEFORE DELETE TRIGGERS these can copy the old version of each record over to the archive (and also add the metadata at the same time) each time a record is updated or deleted.

Related

Logging of data change in mysql tables using ado.net

Is there any work around to get the latest change in MySQL Database using Ado.NET.
i.e. change in which table, which column, performed operation, old and new value. both for single table change and multiple table change. want to log the changes in my own new table.
There are several ways how change tracking can be implemented for mysql:
triggers: you can add DB trigger for insert/update/delete that creates an entry in the audit log.
add application logic to track changes. Implementation highly depends on your data layer; if you use ADO.NET DataAdapter, RowUpdating event is suitable for this purpose.
Also you have the following alternatives how to store audit log in mysql database:
use one table for audit log with columns like: id, table, operation, new_value (string), old_value (string). This approach has several drawbacks: this table will grow up very fast (as it holds history for changes in all tables), it keeps values as strings, it saves excessive data duplicated between old-new pairs, changeset calculation takes some resources on every insert/update.
use 'mirror' table (say, with '_log' suffix) for each table with enabled change tracking. On insert/update you can execute additional insert command into mirror table - as result you'll have record 'snapshots' on every save, and by this snapshots it is possible to calculate what and when is changed. Performance overhead on insert/update is minimal, and you don't need to determine which values are actually changed - but in 'mirror' table you'll have a lot of redundant data as full row copy is saved even if only one column is changed.
hybrid solution when record 'snapshots' are temporarily saved, and then processed in background to store differences in optimal way without affecting app performance.
There are no one best solution for all cases, everything depends on the concrete application requirements: how many inserts/updates are performed, how audit log is used etc.

How to create a linked mysql database

I have software that reads only one database by name. However, every day I have to check for records that are 30+ days old so my solution is to rename the database everyday (appending a timestamp) and create a new one with the old name so my software can continue to run.
I need my software to read all of the databases but it can only read one. Is there a way to link the main database with the archived ones without copying the database? I don't think I can use MERGE because I won't be able to split the databases by day.
e.g.
Software only reads database MAINDB
Everyday, a cronjob renames the database. MAINDB becomes BKDB_2015_12_04. I can still access the database from mysql because it's not a dumped database.
A new MAINDB is made for the software to read.
However, I need the software to read the data stored in BKDB_2015_12_04 and any other database BKDP_*
I'd like to have the software, when reading MAINDB, also read BKDB_*
Essentially, I'm having some databases 'read-only' and I'm partitioning the data by day. I'm reading about using PARTITION but I'm dealing with an immense amount of data and I'm not sure if PARTITION is effective in dealing with this amount of data.
Renaming and re-creating a database is a "bad idea". How can you ever be sure that your database is not being accessed when you rename and re-create?
For example, say I'm in the middle of a purchase and my basket is written to a database table as I add items to it (unlikely scenario but possible). I'm browsing around choosing more items. In the time I'm browsing, the existing database is renamed and a new one re-created. Instantly, my basket is empty with no explanation.
With backups, what happens if your database is renamed half=way through a backup? How can you be sure that all your other renamed databases are backed up?
One final thing - what happens in the long run with renamed databases? Are they left there for ever? Are the dropped after a certain amount of time? etc
If you're checking for records that are 30+ days old, the only solution you should be considering is to time-stamp each record. If your tables are linked via single "master" table, put the time-stamp in there. Your queries can stay largely the same (except from adding a check for a times-stamp) and you don't have to calculate database names for the past 30 days
You should be able to do queries on all databases with UNION, all you need to know is the names of the databases:
select * from MAINDB.table_name
union all
select * from BKDB_2015_12_04.table_name
union all
select * from database_name.table_name

Ruby/Bash script to backup my table and delete records

I'm save all the transactions in DB instead of logs , but i don't want the table to get huge and slow , so I was thinking to create a cron job to do something every few month like :
1- Backup the table for hard drive
2- move all the records to a new table something like table_backup
3- delete the records on that table
This way in case insert will take lot of time with huge table, the table will be freed every few months
Please not that I'm using ruby with active record models to access the DB tables , what do you think the best way to do such a thing , and is there any alternatives to what I suggested ?
I would suggest the following:
Redundancy - depending on how critical your data is, you may want redundant storage (e.g. a master-slave database setup, or the database on a RAID device)
Backups - have hourly/daily/weekly backups (again, depending on how critical it is to maintain these backups, how much space you can afford for them, how much traffic you're getting, and what the impact is on the database) of the entire database.
Truncation - have a cron task (check out the whenever gem which makes this easy) that deletes all entries older than some threshold (2 weeks?). There's no need to populate a new table just to delete old entries.
I believe these approaches are orthogonal, so you can pick whichever ones suit you, or implement the important one(s) first.

How to update DB structure when updating production system without doing a teardown / rebuild

If I'm working on a development server and have updates to the database structure for some of our releases, what is the best way to update the structure on the production server?
Currently we create a new production database containing the structure only, do a SQL dump of the data on the 'old' production database, then run a SQL query to insert the data into the new database.
I know there is an easier way to do these updates, right?
Thanks in advance.
We don't run anything on prod without a script and that script must be in source control. Additionally we have to write a rollback script in case the initial script goes bad and we have to back it out. And when we move to prod configuration management does a differential compare between prod and dev to see if we have missed anything in the production script (any differences have to be traceable to development we are not yet ready to move to prod and documented). A product like Red-gate's SQL compare can do this. Our process is very formalized so that we can maintain a certification required by our larger clients.
If you have large tables even alter table can be slow, but it's still generally more efficient in total time than making a copy of the table with a new name and structure, copying the data to that table, renaming the old table, then naming the new table the name of the orginal table, then deleting the old table.
However, there are times when that is a preferable process as the total down time apparent to the user in this case is the time it takes to rename two tables, so this is good for tables where the data only is filled from the backend not the application (if the application can update the tables, it is a dangerous practice to do this as you may lose changes made while the tables were in transition). A lot of what process to use depends on the nature of the change you are making. Some changes should be done in a maintenance window where the users are not allowed to access the database. For instance if you are adding a new field with a default value to a table with 100,000,000 records, you are liable to lock up the users from using the table while the update happens. It is better to do this in single user mode during off hours (and when the users are told in advance the database will not be available). Other changes only take milliseconds and can happen easily while users are logged in.
Look at alter table to change the schema
It might not be easier than your method but it means less copying of the database
This is actually quite a deep question. If the only changes you've made are to add some columns then ALTER TABLE is probably sufficient. But if you're renaming or deleting columns then ALTER statements may break various foreign key constraints. In addition, sometimes you need to make changes both to the database and the data, which is pretty much unscriptable.
Most likely the best way to automate this would be to write a simple script for each deployment (along with a script to roll back!) which is basically what some systems like Rails will do for you I believe. Some scripts might be simply ALTER statements, some might temporarily disable foreign-key checking and triggers etc, some might run some update statements as well. And some might be dumping the db and rebuilding it. I don't think there's a one-size-fits-all solution here, sorry :)
Use the ALTER TABLE command: http://dev.mysql.com/doc/refman/5.0/en/alter-table.html

What is the best way to update (or replace) an entire database table on a live machine?

I'm being given a data source weekly that I'm going to parse and put into a database. The data will not change much from week to week, but I should be updating the database on a regular basis. Besides this weekly update, the data is static.
For now rebuilding the entire database isn't a problem, but eventually this database will be live and people could be querying the database while I'm rebuilding it. The amount of data isn't small (couple hundred megabytes), so it won't load that instantaneously, and personally I want a bit more of a foolproof system than "I hope no one queries while the database is in disarray."
I've thought of a few different ways of solving this problem, and was wondering what the best method would be. Here's my ideas so far:
Instead of replacing entire tables, query for the difference between my current database and what I want to place in the database. This seems like it could be an unnecessary amount of work, though.
Creating dummy data tables, then doing a table rename (or having the server code point towards the new data tables).
Just telling users that the site is going through maintenance and put the system offline for a few minutes. (This is not preferable for obvious reasons, but if it's far and away the best answer I'm willing to accept that.)
Thoughts?
I can't speak for MySQL, but PostgreSQL has transactional DDL. This is a wonderful feature, and means that your second option, loading new data into a dummy table and then executing a table rename, should work great. If you want to replace the table foo with foo_new, you only have to load the new data into foo_new and run a script to do the rename. This script should execute in its own transaction, so if something about the rename goes bad, both foo and foo_new will be left untouched when it rolls back.
The main problem with that approach is that it can get a little messy to handle foreign keys from other tables that key on foo. But at least you're guaranteed that your data will remain consistent.
A better approach in the long term, I think, is just to perform the updates on the data directly (your first option). Once again, you can stick all the updating in a single transaction, so you're guaranteed all-or-nothing semantics. Even better would be online updates, just updating the data directly as new information becomes available. This may not be an option for you if you need the results of someone else's batch job, but if you can do it, it's the best option.
BEGIN;
DELETE FROM TABLE;
INSERT INTO TABLE;
COMMIT;
Users will see the changeover instantly when you hit commit. Any queries started before the commit will run on the old data, anything afterwards will run on the new data. The database will actually clear the old table once the last user is done with it. Because everything is "static" (you're the only one who ever changes it, and only once a week), you don't have to worry about any lock issues or timeouts. For MySQL, this depends on InnoDB. PostgreSQL does it, and SQL Server calls it "snapshotting," and I can't remember the details off the top of my head since I rarely use the thing.
If you Google "transaction isolation" + the name of whatever database you're using, you'll find appropriate information.
We solved this problem by using PostgreSQL's table inheritance/constraints mechanism.
You create a trigger that auto-creates sub-tables partitioned based on a date field.
This article was the source I used.
Which database server are you using? SQL 2005 and above provides a locking method called "Snapshot". It allows you to open a transaction, do all of your updates, and then commit, all while users of the database continue to view the pre-transaction data. Normally, your transaction would lock your tables and block their queries, but snapshot locking would be perfect in your case.
More info here: http://blogs.msdn.com/craigfr/archive/2007/05/16/serializable-vs-snapshot-isolation-level.aspx
But it requires SQL Server, so if you're using something else....
Several database systems (since you didn't specify yours, I'll keep this general) do offer the SQL:2003 Standard statement called MERGE which will basically allow you to
insert new rows into a target table from a source which don't exist there yet
update existing rows in the target table based on new values from the source
optionally even delete rows from the target that don't show up in the import table anymore
SQL Server 2008 is the first Microsoft offering to have this statement - check out more here, here or here.
Other database system probably will have similar implementations - it's a SQL:2003 Standard statement after all.
Marc
Use different table names(mytable_[yyyy]_[wk]) and a view for providing you with a constant name(mytable). Once a new table is completely imported update your view so that it uses that table.